Pinnacle Pipe Threading

Edmonton, AB
2014_033_Pinnacle_Pipe-4707

On point: CPI completed this $2.5-million design-build from July 2012 to March 2013. Pinnacle Pipe Threading’s project included a 17,000-square-foot office and pipe threading shop using a pre-engineered structure.